![](https://i0.wp.com/ppcdn.500px.org/60595672/c317e7da9cab2f48467d073ed3ce75b547aaac76/4.jpg)
Marina Coastal Expressway is the tenth of Singapore’s network of expressways. Construction for the MCE began in 2008 and was completed at the end of 2013. The 5-kilometre (3.1-mile) MCE connects with the southern end of the KPE and its junction with the ECP to the eastern end of AYE.